8 Savile Row — Basement Refurbishment
Commercial Fit-OutMayfair · London W1

8 Savile Row — Basement Refurbishment

Internal refurbishment and fit-out of a basement workspace for CAD & the Dandy, delivered between August and October 2024.

Value
£205k
Period
Aug–Oct 2024
Client
CAD & the Dandy
Sector
Commercial
Project overview

A considered delivery shaped by context, programme and finish.

A tightly delivered Mayfair fit-out combining asbestos management, layout alterations and a full interior finishing package.

The works comprised the internal refurbishment and fit-out of the basement at 8 Savile Row, London W1, for CAD & the Dandy with FINE Architecture acting as architect.

The programme began with an asbestos survey and removal before progressing into alterations to the existing basement layout, new ceilings and internal doors.

Decorations, flooring, carpeting, mirrors, fixtures and fittings, and mechanical and electrical services completed the refreshed Mayfair interior over a short August-to-October 2024 programme.

Scope of works

Built around the detail, not just the headline.

Asbestos survey and removal

Layout alterations

Suspended ceilings

Internal doors

Decorations

Flooring

Carpeting

Mirrors

Fixtures and fittings

Mechanical and electrical services

Delivery and specification

What gave the project its character.

01

Short, controlled programme

The project moved quickly from enabling works into fit-out, requiring tight coordination across all finishing trades within a central London address.

02

Refreshed basement layout

Layout alterations, ceilings and new internal doors gave the lower-ground space a clearer, more resolved plan before final finishes were applied.

03

Complete commercial finish

From carpeting and mirrors to fixtures, services and decoration, the project was handed over as a complete working environment rather than a partial refurbishment.

Project gallery

A visual record of the project before, during and after completion.

Completed project

The finished fit-out introduces a much more tailored, client-facing environment with bespoke joinery, mirrors, display zones and a calmer material palette throughout.

Street-facing storefront of Cad & The Dandy at 8 Savile Row
Savile Row storefront
Wide interior view of the completed Savile Row showroom lounge
Showroom arrival space
Mirrored fitting area and lounge seating inside the Savile Row showroom
Mirrored fitting zone
Central illuminated display counter inside the Savile Row showroom
Central display counter
Green fluted joinery and reception counter inside the Savile Row project
Joinery and reception detail
Tailoring display wall with mannequins and seating inside the Savile Row showroom
Tailoring display wall
Showroom seating area with mannequins and fabric display inside the Savile Row project
Client consultation area
Bar stool and joinery detail near the fitting area inside the Savile Row showroom
Fitting area detail
Window-side display area with mannequins inside the Savile Row showroom
Window-side tailoring display
Before works

These early photos show the basement before the fit-out began, when the space was still open, exposed and largely undecorated.

Before photo of the open basement room at Savile Row prior to fit-out
Before works — main floorplate
Before photo of the Savile Row basement showing open floor area and temporary shelving
Before works — open retail shell
Before photo of the Savile Row basement facing the window bay and open room
Before works — window-side area
Before photo of the Savile Row basement showing the stair side and open circulation area
Before works — circulation side