Front elevation of Ragged School Museum
Heritage & Culture Case Study

Ragged School:
Preserving the Legacy.

Value
£2.9m
Duration
May 21 - Dec 22
Status
Grade II Listed
Awards
RICS Nominated 2024

A Barnardo Legacy Reclaimed

The Ragged School Museum, a Grade II listed Victorian treasure, is the only surviving building associated with Dr Barnardo in the area where his pioneering work began. We were tasked with a £2.9m complete refurbishment to secure its future.

Our work treated the historic fabric with care while introducing the facilities needed for the museum to operate properly today.

RICS Regional Awards 2024 Nominee

Recognised in both the Heritage Project and Refurbishment/Revitalisation Project categories, reflecting the quality of the work and its value to the local community.

The Scope

  • Complete refurbishment of all four floors
  • Restoration of historic roof, stonework, and brick
  • Overhaul of retained Victorian sash windows
  • New commercial catering kitchen and cafe
  • Installation of new lift facilities and MEP services
  • Replacement of modern features with historic alternatives

Project photography

The finished work pairs careful conservation with practical, public-facing upgrades — from the canal elevation and classroom spaces to the cafe, catering areas and back-of-house services.

Ragged School Museum canalside elevation
Ragged School Museum

Canalside elevation

A restored listed frontage reconnecting the museum with the waterside setting.

Close exterior view of the Ragged School brick facade
Ragged School Museum

Historic envelope

Brickwork, openings and boundary conditions carefully retained and repaired.

Historic classroom at Ragged School Museum
Ragged School Museum

Museum classroom

Original character preserved to keep the Barnardo story tangible for visitors.

Cafe counter installation at Ragged School Museum
Ragged School Museum

Cafe counter

New visitor-facing hospitality facilities inserted within the historic shell.

Commercial kitchen fit-out at Ragged School Museum
Ragged School Museum

Kitchen line

Durable catering finishes and service-ready back-of-house preparation space.

Stainless steel prep kitchen at Ragged School Museum
Ragged School Museum

Prep kitchen

A second catering area delivered with clean, robust operational detailing.

Fitted kitchenette within Ragged School Museum interior
Ragged School Museum

Support spaces

Contemporary joinery and lighting introduced without losing the building's warmth.

Restored staircase and painted timberwork at Ragged School Museum
Ragged School Museum

Stair restoration

Historic circulation spaces repaired and refreshed to preserve their original character.

Mechanical plant room installation at Ragged School Museum
Ragged School Museum

Plant room upgrade

Modern services infrastructure integrated to support long-term museum operation.

Finished heritage-style WC at Ragged School Museum
Ragged School Museum

Heritage-compatible finishes

New sanitary spaces detailed to sit comfortably within the listed fabric.

Technical Restoration

From structural Helibar repairs to delicate timber window restoration, every detail was delivered with precision.

Structural Integrity

Implementation of masonry works including structural Helibar repairs, chimney restoration, and specialized zinc roof coverings to ensure long-term stability.

Museum Facilities

Creation of a new commercial catering kitchen and cafe, including Altro Whiterock linings and a modern ventilation system, ready for public service.

Heritage Finishes

Use of fire-retardant paints on historic timber, concrete repairs to internal staircases, and restoration of architectural metalwork including balustrading.

Project Team

  • ClientRagged School Museum Trust
  • ArchitectRichard Griffiths Architects
  • Structural EngineerMorton Partnership
  • Contract ManagerSuvinder Kalkat
Front view of Ragged School Museum
Historic classroom interior at Ragged School Museum