Compliance-led delivery
The project required full adherence to HSE licensing procedures and asbestos control regulations, with each stage built around safety and traceability.

Licensed removal and safe disposal of asbestos-containing skylights, followed by full weatherproofing to every roof opening.
A tightly controlled remediation package focused on safe access, compliant asbestos handling and a durable final roof seal.
Bryen & Langley were engaged to remove and dispose of redundant asbestos-containing skylights at Queen Mary's Hospital, a decommissioned NHS site in the London Borough of Bexley.
All asbestos activities were carried out by licensed and accredited contractors in accordance with Control of Asbestos Regulations 2012 and HSE licensing requirements, with notification submitted prior to commencement.
After removal, each roof opening was infilled with timber framing and plywood sheeting before receiving a Centaur liquid waterproofing system to create a durable, weather-tight finish.
Licensed asbestos removal
Safe disposal of ACMs
External scaffold staircase
Mobile crash deck protection
Timber framing to openings
Plywood sheeting infill
Centaur waterproofing system
Weather-tight finish
Contamination management
Licensed waste disposal
The project required full adherence to HSE licensing procedures and asbestos control regulations, with each stage built around safety and traceability.
External scaffold access and internal crash-deck protection kept the removal process controlled from roof level through to the spaces below.
The final timber, plywood and Centaur waterproofing build-up ensured each former rooflight opening was fully sealed and protected against weather ingress.

A wide roof-level view shows the completed closures sitting neatly within the existing roofscape after the asbestos-containing skylights were removed.

The finished build-up demonstrates the clean, durable handover condition achieved across each former rooflight opening.

Grouped openings were sealed consistently, helping the roof read as orderly and fully protected once remediation was complete.

This wider area shows the scale of the package and the repetition required to complete multiple rooflight closures safely and efficiently.

The works had to be coordinated carefully around existing plant, edges and adjacent buildings while maintaining safe roof access throughout.

Closer detail highlights the crisp perimeter finish achieved around each infilled opening before final waterproofing was completed.

The repeated sequence of completed closures reinforces the methodical, compliance-led nature of the remediation package across the wider roof.