Project overview

A considered delivery shaped by context, programme and finish.

A tightly controlled remediation package focused on safe access, compliant asbestos handling and a durable final roof seal.

Bryen & Langley were engaged to remove and dispose of redundant asbestos-containing skylights at Queen Mary's Hospital, a decommissioned NHS site in the London Borough of Bexley.

All asbestos activities were carried out by licensed and accredited contractors in accordance with Control of Asbestos Regulations 2012 and HSE licensing requirements, with notification submitted prior to commencement.

After removal, each roof opening was infilled with timber framing and plywood sheeting before receiving a Centaur liquid waterproofing system to create a durable, weather-tight finish.

Scope of works

Built around the detail, not just the headline.

Licensed asbestos removal

Safe disposal of ACMs

External scaffold staircase

Mobile crash deck protection

Timber framing to openings

Plywood sheeting infill

Centaur waterproofing system

Weather-tight finish

Contamination management

Licensed waste disposal

Delivery and specification

What gave the project its character.

01

Compliance-led delivery

The project required full adherence to HSE licensing procedures and asbestos control regulations, with each stage built around safety and traceability.

02

Safe access by design

External scaffold access and internal crash-deck protection kept the removal process controlled from roof level through to the spaces below.

03

Clean handover condition

The final timber, plywood and Centaur waterproofing build-up ensured each former rooflight opening was fully sealed and protected against weather ingress.

Project gallery

A visual record of the project before, during and after completion.

Roof level overview of completed skylight closures at Queen Mary's Hospital
Completed roof overview

A wide roof-level view shows the completed closures sitting neatly within the existing roofscape after the asbestos-containing skylights were removed.

Close roof view of weatherproofed skylight closures at Queen Mary's Hospital
Weatherproofed roof closures

The finished build-up demonstrates the clean, durable handover condition achieved across each former rooflight opening.

Three completed skylight closures on the roof at Queen Mary's Hospital
Grouped closure detail

Grouped openings were sealed consistently, helping the roof read as orderly and fully protected once remediation was complete.

Additional roof closure area at Queen Mary's Hospital
Extended roof field

This wider area shows the scale of the package and the repetition required to complete multiple rooflight closures safely and efficiently.

Dark-coated roof closures adjacent to the main hospital building at Queen Mary's Hospital
Adjacent building edge

The works had to be coordinated carefully around existing plant, edges and adjacent buildings while maintaining safe roof access throughout.

Single completed roof closure near a plant enclosure at Queen Mary's Hospital
Single opening closure

Closer detail highlights the crisp perimeter finish achieved around each infilled opening before final waterproofing was completed.

Long run of completed roof closures at Queen Mary's Hospital
Repeated closure sequence

The repeated sequence of completed closures reinforces the methodical, compliance-led nature of the remediation package across the wider roof.