Night view of Brixton Recreation Centre
Workspace Case Study

Brixton Rec Quarter:
Workspace under the Rec.

We delivered a new workspace within the basement of Brixton Recreation Centre, combining structural alteration, careful fit-out and a straightforward respect for the building's existing character.

Project
Basement workspace
Client
LB Lambeth
Status
Grade II listed
Architect
MUF Architecture

The Brief

This project formed part of the wider Brixton Rec Quarter regeneration and focused on turning underused basement space into something practical, welcoming and publicly legible.

The work combined heavy enabling elements with a more careful internal fit-out. We created new structural openings, introduced supporting steelwork, and built the stair and lift connection needed to link the new workspace back to the main Rec. From there, the emphasis shifted to making the rooms work properly: durable finishes, usable support spaces, clear circulation and enough warmth to stop the basement feeling sealed off.

Exterior of Brixton Recreation Centre during the dayBrick-lined access route within Brixton Rec Quarter

A grounded approach

"We tried to keep the interventions legible: open the space up, let the existing structure do some of the visual work, and add the parts the building needed to support everyday use."

Main internal stair and lift within the Brixton workspace

Project Team

  • ClientLondon Borough of Lambeth
  • ArchitectMUF Architecture LLP
  • Quantity SurveyorIKS Consulting Ltd
  • ScopeStructural alterations and workspace fit-out

Gallery

A broader set of views across the completed workspace, its access routes and its relationship to the Rec.

Tiered seating built into the Brixton workspace
Wide view of the internal stair in the Brixton workspace
Exhibition wall with framed artwork and listening points
Landing view across the stair and lower level of the workspace
Model display room within the Brixton workspace
Lounge area with drawings laid out on a table
Open workspace area beneath exposed services and concrete structure
Workspace floor with exposed concrete columns and waffle slab ceiling
Upper level circulation space in the Brixton workspace

From raw basement to workable rooms

The finished space still reads as part of the original building, but it now works much harder. Access is clearer, the rooms are more open, the detailing is more considered, and the fit-out gives the workspace enough comfort and flexibility to support exhibitions, meetings and everyday use.

Access

New stair and lift connection between the basement and the Rec.

Use

Gallery walls, seating and support spaces built into the plan.

Character

Existing concrete, blockwork and waffle slabs left to carry the identity.

What shaped the job

The challenge here was balancing intervention with restraint: enough change to make the space useful, without losing the blunt honesty that made it worth keeping.

Structural openings and access

We formed new openings, introduced supporting steelwork and created the new stair and lift connection back into the Rec.

Fit-out that feels used, not staged

Seating, display areas, kitchens and toilets were delivered as working parts of the project rather than decorative extras.

Respect for the existing building

The exposed waffle ceiling and robust concrete frame were treated as assets, not something to cover up.

A more useful, more visible space

The result is a workspace that feels tied to the building it sits within. It does not pretend the basement was ever anything else, but it now has the access, infrastructure and atmosphere to support community use properly.

New basement workspace within a listed structure
Improved access and visibility from the Rec concourse
Flexible gallery, seating and support spaces
A practical fit-out with the original character left intact
Exterior corner view of Brixton Recreation Centre
Listed
Existing fabric respected
Open
Clearer circulation and sightlines
Usable
Flexible for exhibitions and work